HCL’s Corrosion Protection to Piles was selected for MOD Fueling Jetty at Plymouth. Protect was for all the vertical piles for the new Jetty installation which comprised of: Ø711mm x 36 piles Ø1542mm x 14 piles, Vertical Protection from 2.6m to 4.38m, 360° Inspection Windows for 18qty random selected, and Protection of Horizontal Barrier Joints Ø1016mm
The client selected HCL due to the following reasons;
The HCL Pile Protection System is comprised of 6 simple components, Petrolatum Paste, Petrolatum Tape, 2mm HDPE Outer Armour & Edging Strip (to protect the seal) and 19mm or 32mm Smart Band Hybrid system (Width dependant on Pile Diameter) made from POM material. Smart Band is secured using either the 2000 or 1000 Hand Tools
The need for continued monitoring and inspection of the substrate is well catered for with the HCL Pile Wrap system with the ability to include a full 360° inspection jacket. Positioned at a recommended 10% of locations on the project and featuring re-usable jackets this facility provides fast and efficient inspections. The simple steps for removing, inspecting and reinstalling the HDPE outer armour are outlined below.
Main office:
Clamping house
1st avenue westfield industrial estate
Radstock, bath, somerest
Ba3 4bs
United kingdom
Main office:
20220 Hempstead Road,
Suite 20
Houston, Texas, 77065
USA